In anticipation of the proposal hand in, I've decided to layout my plans on what I'll be doing in the weeks leading up to Friday 7th.



A total of 37hrs has been put aside for the remaining time which should be enough to collect the remaining research material and complete a mock proposal prior to the hand in date. I have given myself a lot of time with the feedback / proposal changes as there may be topics or critical reference material I have missed or need to look at closer. Hopefully I'll get some feedback on the Friday 1st for the first mock hand in and will be able to work on my second mock proposal if required to or go straight to the hand in version.

There's a few key blogs & research tasks I need to spend a good amount of time on, probably alot more than I've tasked on this time table as I'm stating the minimum I must do.
  • Fri 24th - Decision on whether I'll be doing a interior or exterior modular asset kit
  • Sun 26th - Decision on architecture and theme for the scene(s)
  • Tues 28th - Criteria - Must get approval from Dave